CRBBG Win The Bid for Fabrication of Steel Girders for Jinsha River Bridge f..
CRBBG successfully won the bid of contract of Jinsha River Combined Bridge for Chengdu-Guiyang Railways a few days ago. The total weight of steels for the bridge is about 22,088 tons.
As the pivotal project of Chengdu-Guiyang Railways, Jinsha River Bridge is a combined arch bridge with the greatest span in the world, and the overall length of the bridge is 1,973m. The bridge has an unique and novel structural design of railway above and highway below. The bridge is composed of three parts, i.e. railway and highway combination, separate railway and separate highway. In which, the combined section is 1,213m long and the separate railway 661.9m long. The construction period for the project is about four years.