The trial manufacturing and assembly of the 1st set of turnout for Guiyang rail transit Line 1 project, undertaken by CRBBG Tycoon Industrial Development Co., Ltd (TIDC), passed the acceptance review on August 30.
The experts gave a high appraisal to TIDC's product quality and work efficiency, and they came to an agreement that the documents for the product were complete and normal and conformed to the authentication requirement; all dimensions of the trial manufactured and assembled turnout were checked and met the requirements in design drawings and relevant standards; the manufacturing processes were proper and feasible; and the fixtures and templates were reliable and all in readiness, thus the turnout passed the review.
Guiyang urban rail transport Line 1 starts from West Xiamai Station in Guanshanhu District, via Lincheng Road, National Road 210, North Guiyang Station, Yaguan, Manpo, Anyun Road, Hequn Road, Park Road, Guiyang Railway Station, Chaoyangdong Road, Pearl River Road, and ends at Bacun Station in Xiaohechang. The overall length of the line is 33.6km, including 27km for underground and 6.6km for elevated and ground. The line has 23 stations, 18 for underground and 5 for elevated.Guiyang light rail Line 1 is constructed to ease the traffic pressure of Guiyang, to perfect the comprehensive transportation system of the city and to realize the goal of urban master planning of Guiyang. Guiyang's transportation will be completely improved when the rail transport is put into operation.