For Shenyang Dingxiang Bridge on the 3rd ring road, undertaken by Tycoon Industrial Development Co., Ltd (TIDC), the fabrication of 31 girder segments and erection and pushing of 9 girder segments have been completed with a total weight of about over 3,000 tons, through endeavor of all staff of the Project Department of the company.
Shenyang's 3rd ring road bridge is the first bridge constructed by CRBBG in northeast area. The bridge is located on Shenyang's ring expressway, which is an important part of expressway net of Liaoning province, connecting 7 radiate expressways from Shenyang to Beijing, Siping, Jilin, Zhangwu, Dalian, Fushun and Dandong. With an overall length of 498 meters, the bridge spans 8 main railway lines in Shenyang. The steel girders of the bridge are divided into 8 types, and the typical girder segment is 9 meters, totally 57 segments of the bridge and total weight of about 5,100 tons. Among which, 4 segments for 61 meters span, the greatest span, 2 for 48 meters span and 4 for 38 meters span. The width of deck is 19.8 to 21.3 meters and the height of girder is 3.1125 meters.