
Completed in 1999, this is a 3-span continuous steel box girdercable-stayed bridge with double towers and double cable planes. Themain span is 518m. The steel box girders are totally 718m long withtotal weight of about 9,400 tons. lt is the first composite cable-stayedbridge with steel box girder and PC box girder in China.