By overcoming the difficulty of offshore construction, CRBBG's HZMB (Hongkong-Zhuhai-Macao Bridge) project office at the bridge site successfully lifted the steel tower at pier No.207 to the bridge deck recently, which created conditions for the next step installation.
Connecting Hongkong, Macao and Zhuhai, HZMB is a supergiant infrastructure jointly constructed by Guangdong, Hongkong and Macao. The project is on a grand scale and high standard requirement, with the design service life of 120 years and the requirement of safety, environmental protection, durability and elegant appearance.
After more than two years' thoughtful arrangement and production, CRBBG has finished all work for general assembly of the bridge, and 80% quantities have been finished for bridge site construction.