CN
Projects
Projects

Croatian Peljesac Bridge Project

Project Launch

Startdate: Duration:
Project Launch

The Croatian Peljesac Bridge Project is located in the Maliston Bay Nature Reserve of the Adriatic Sea, connecting the Croatian mainland with the Peljesac Peninsula.

The Peljesac Bridge has a total length of 2440m and is a six-tower single-plane cable-stayed bridge with a span of 285m. The whole bridge has a total of 13 spans, the steel box girder layout is 84.0+108.0+108.0+189.5+5x285.0+189.5+108.0+108.0+84.0=2404.0m, two-way two-lane, two-way cross slope 2.5%, the main bridge steel box girder adopts The orthotropic plate has a top width of 22.5 meters, a box bottom width of 8.1 meters, and a height of 4.5 meters.

The steel box girder of this bridge adopts the European standard (EN 1090-2 EXC4), the steel plate adopts the European standard (EN 10025) S355J2/S355N/S460, the standard section length of the steel box girder is 12m, and the total weight of the steel box girder is about 34000t. CRBBG is responsible for the steel box girder ( 18,130 tons) raw material procurement, shop drawing, manufacturing, trial assembly, painting, storage, harbor collection, on-site bridge welding, paint repainting.


 

 



How can we help you?

If you have questions or feedback, please feel free to contact us. We are happy to help!

CONTACT US